05-09 Interior and Audio Mods Enhancing Your Mustang's Interior and Sound System

Full Billet Switch Plates:...Please...

Thread Tools
 
Search this Thread
 
Old Aug 8, 2008 | 01:07 PM
  #121  
spike's Avatar
Bullitt Member
 
Joined: October 14, 2004
Posts: 414
Likes: 0
From: DC Metro Area
Originally Posted by seaclam
I hate to bump my own thread, but it's been a while and I was wondering what's up with these? Are we any closer? Will we see them by the end of the year?
Originally Posted by Boltzman
+1
Meeeee toooooo....

Last edited by spike; Aug 8, 2008 at 01:09 PM.
Reply
Old Aug 8, 2008 | 01:42 PM
  #122  
SilverHorse-----Racing's Avatar
Legacy Tms Member
 
Joined: January 9, 2005
Posts: 2,037
Likes: 2
I know - two words...

Blame Saleen

We are running fuel doors at the moment, and since the switch plate is a mill job, they can't get up on the mill until doors are through. SEMA is just around the corner for us, and so I know we need a lot of this stuff done and in-process before we get there, we're hiring a second person in just 4 months to try and get ahead of this for everyone - not bad when everyone else is cutting back...

FYI there are a bunch of pieces on the interior that were missing from our car at Mustang Week - anyone with a keen eye would be able to tell some of the stuff we are working to bring to market for everyone.

At least I'm keeping to our promise - no new billet products until switch plates are made.
Reply
Old Aug 8, 2008 | 05:50 PM
  #123  
Boltzman's Avatar
GTR Member
 
Joined: April 20, 2005
Posts: 4,660
Likes: 2
From: Tampa,FL
Good news
Reply
Old Aug 27, 2008 | 10:56 PM
  #124  
SilverHorse-----Racing's Avatar
Legacy Tms Member
 
Joined: January 9, 2005
Posts: 2,037
Likes: 2
24 feet (~135 Lbs) of material showed up today that was ordered just for a certain piece you guys have been looking for...

Have to run some cup holders first to keep up with orders, but then we're on them!
Reply
Old Aug 28, 2008 | 02:21 AM
  #125  
Stoenr's Avatar
Legacy TMS Member
 
Joined: May 31, 2005
Posts: 3,270
Likes: 24
From: E. Tennessee
Awesome!!!!! I will be 1st on the list!
Reply
Old Aug 28, 2008 | 08:17 AM
  #126  
Boltzman's Avatar
GTR Member
 
Joined: April 20, 2005
Posts: 4,660
Likes: 2
From: Tampa,FL
Can't wait
Reply
Old Aug 28, 2008 | 10:02 AM
  #127  
Pwny's Avatar
Mach 1 Member
 
Joined: December 4, 2007
Posts: 893
Likes: 0
From: Columbus, OH
I'm liking how Brad mounted his gauges in the center.
Reply
Old Aug 28, 2008 | 10:12 AM
  #128  
Boltzman's Avatar
GTR Member
 
Joined: April 20, 2005
Posts: 4,660
Likes: 2
From: Tampa,FL
Originally Posted by Pwny
I'm liking how Brad mounted his gauges in the center.
Think you got the wrong thread
Reply
Old Aug 28, 2008 | 10:17 AM
  #129  
2k7gtcs's Avatar
Post *****
 
Joined: October 9, 2007
Posts: 32,808
Likes: 163
I think he's tlaking about this post from first page of this thread.

http://forums.bradbarnett.net/showpo...8&postcount=12
Reply
Old Sep 16, 2008 | 04:24 PM
  #130  
Stoenr's Avatar
Legacy TMS Member
 
Joined: May 31, 2005
Posts: 3,270
Likes: 24
From: E. Tennessee
Feels like an eternity, lol.
Reply
Old Sep 29, 2008 | 03:38 PM
  #131  
spike's Avatar
Bullitt Member
 
Joined: October 14, 2004
Posts: 414
Likes: 0
From: DC Metro Area
Originally Posted by SilverHorseRacing
24 feet (~135 Lbs) of material showed up today that was ordered just for a certain piece you guys have been looking for...

Have to run some cup holders first to keep up with orders, but then we're on them!
PING..... ping.... ping....
(just a monthy whatup. any prototypes?)
Reply
Old Sep 29, 2008 | 05:29 PM
  #132  
SilverHorse-----Racing's Avatar
Legacy Tms Member
 
Joined: January 9, 2005
Posts: 2,037
Likes: 2
Coming baby... I know sounds like a broken record some days, but Ford and Saleen have kind of got a priority position, and so I had to hold prototypes of these until we got them taken care of. I will have them at SEMA if I have to hand build them on the Bridgeport mill, so keep the faith.

Fuse covers are almost done, just doing engraving work now.

Door locks are done.

Door lock pockets will prototype after switch plates.

As we do the prototypes, we build all the fixtures for production as well, so right after SEMA is done, we can hopefuly push right into production with them. Given how slow our finishers are right now, we'll be getting parts out relatively quickly compared to their normal 3-4 week turn-around.
Reply
Old Sep 29, 2008 | 09:53 PM
  #133  
sound wave's Avatar
Mach 1 Member
 
Joined: October 20, 2005
Posts: 874
Likes: 0
From: Honolulu, Hawaii
sorry, if it has already been explained, but what is a door lock and pocket? is that the pull pin that goes up and down when you lock/unlock the door?

if so, i guess the pocket is the area around that pull pin, huh? just want to make sure i understand. thanks.
Reply
Old Sep 30, 2008 | 09:21 AM
  #134  
n8rfastback's Avatar
Shelby GT350 Member
 
Joined: June 25, 2007
Posts: 2,416
Likes: 1
yes thats correct... i think
Reply
Old Sep 30, 2008 | 10:10 AM
  #135  
SilverHorse-----Racing's Avatar
Legacy Tms Member
 
Joined: January 9, 2005
Posts: 2,037
Likes: 2
Yep, the pocket goes around the lock pin. I don't like the little inserts offered that glue on, so I want to make these. Problem is they are side-specific, so it's a mirror image, not just a duplicate piece turned around...

Just means a bit more work and a second part to make a kit, but still, we have the fixturing issues about worked out as to how to hold it as we manufacture it.
Reply
Old Oct 3, 2008 | 01:41 PM
  #136  
SilverHorse-----Racing's Avatar
Legacy Tms Member
 
Joined: January 9, 2005
Posts: 2,037
Likes: 2
Here we go!

Ok, talk is one thing, but as always (even if a bit late) we do deliver.

Here's a few shots of where we're at as of today, these are some monster pieces when we start out and not exactly easy to make (maybe why nobody else is...) - just over 4 Lb pieces from the 12ft bars we're starting from. I am expecting the finished piece to be well under 1Lb, maybe we'll have some finished pictures end of next week. delivery will be after SEMA, as right now we're just doing the initial programming and fixture setups for all the new products, production should start Nov. 10th. Of course I don't have a clue what currently will need to be running then, but it will at least be "in the mix".
Attached Images      
Reply
Old Oct 3, 2008 | 01:44 PM
  #137  
Stoenr's Avatar
Legacy TMS Member
 
Joined: May 31, 2005
Posts: 3,270
Likes: 24
From: E. Tennessee
nice action shots!
Reply
Old Oct 3, 2008 | 01:55 PM
  #138  
spike's Avatar
Bullitt Member
 
Joined: October 14, 2004
Posts: 414
Likes: 0
From: DC Metro Area

Is is bad that I'm more excited about these "reveal" pics than the 2010?
Reply
Old Oct 3, 2008 | 02:41 PM
  #139  
n8rfastback's Avatar
Shelby GT350 Member
 
Joined: June 25, 2007
Posts: 2,416
Likes: 1
it would be really cool if you could take this right after they are cut and powdercoat them to match exterior paint options.....
Reply
Old Oct 3, 2008 | 03:39 PM
  #140  
SilverHorse-----Racing's Avatar
Legacy Tms Member
 
Joined: January 9, 2005
Posts: 2,037
Likes: 2
And hide the workmanship in the part? ACCKKK!!! I'm telling our lead machinist!!
Reply



All times are GMT -6. The time now is 11:25 PM.