Boss Second Quarter Allocations
#121
Tasca Super Boss 429 Member
Thread Starter
Join Date: December 18, 2010
Location: NorCal
Posts: 3,708
Likes: 0
Received 0 Likes
on
0 Posts
Come on be more optimistic. The Q1 cars don't need to be delivered before they start scheduling Q2 cars. Over a 1/3 of Q1 cars have been delivered. There's another 1/3 in the supply chain and most of the other 1/3 have been scheduled. It takes on average three weeks from finished production to delivery. There's a bunch of them already on their way. Not all Boss owners are on this site plus a bunch are ordered for dealer stock. Just check ebay.
#123
V6 Member
Join Date: April 19, 2011
Location: Ithaca Michigan
Posts: 64
Likes: 0
Received 0 Likes
on
0 Posts
Hey Guys Here is one for you. I got a call from my dealer yesterday and he told me that they did not get the allocation they thought they had for a Boss but they did get an allocation for an LS. I told him I would take the LS at MSRP (which is what I had ordered the other Boss at) which was fine with him but I would need to stop and sign a new order and sign off the old order cause he did not want to be held liable...again fine with me. Now for the bombshell the car I had ordered was a 2Q build and I stopped at the dealer this morning and did the required paperwork. As soon as it was done he asked me to stay in his office for a minute while he called his Ford rep to give him/her the required information. When he got off the phone he told me while he was on the phone the order was pulled and that I should have a VIN by the end of the week (and possibly scheduled) along with to expect the car in 3-4 weeks. One thing shipping should not be a ajor issue as I am only 2 hours from the plant. I find it hard to believe that 1Q are not built and they promised that my 2 car would be built....in my opinion almost immediately.
Bob
Bob
#124
Tasca Super Boss 429 Member
Thread Starter
Join Date: December 18, 2010
Location: NorCal
Posts: 3,708
Likes: 0
Received 0 Likes
on
0 Posts
I think most of the Q1 cars have VINs with a couple exceptions. We should see a bunch of Q2 VINs if not by this Friday then by the 29 th.
#125
Hey Guys Here is one for you. I got a call from my dealer yesterday and he told me that they did not get the allocation they thought they had for a Boss but they did get an allocation for an LS. I told him I would take the LS at MSRP (which is what I had ordered the other Boss at) which was fine with him but I would need to stop and sign a new order and sign off the old order cause he did not want to be held liable...again fine with me. Now for the bombshell the car I had ordered was a 2Q build and I stopped at the dealer this morning and did the required paperwork. As soon as it was done he asked me to stay in his office for a minute while he called his Ford rep to give him/her the required information. When he got off the phone he told me while he was on the phone the order was pulled and that I should have a VIN by the end of the week (and possibly scheduled) along with to expect the car in 3-4 weeks. One thing shipping should not be a ajor issue as I am only 2 hours from the plant. I find it hard to believe that 1Q are not built and they promised that my 2 car would be built....in my opinion almost immediately.
Bob
Bob
#126
V6 Member
Join Date: April 19, 2011
Location: Ithaca Michigan
Posts: 64
Likes: 0
Received 0 Likes
on
0 Posts
#128
Cobra Member
Join Date: May 22, 2010
Location: Texas
Posts: 1,065
Likes: 0
Received 0 Likes
on
0 Posts
my q4 allocation is avialble at Jordan Frod in San Antiono if anyone wants it, dont wait though it will go fast. its s normal boss at msrp and you can chang eif you dont want the CO R/T i had on order.
#131
Tasca Super Boss 429 Member
Thread Starter
Join Date: December 18, 2010
Location: NorCal
Posts: 3,708
Likes: 0
Received 0 Likes
on
0 Posts
#132
Originally Posted by 5 DOT 0
I'm asking about VIN's. Your cars VIN was probably issued in the first week of December like most of the early build cars. There have already been a few VIN's issued for Q2 cars.
#133
Tasca Super Boss 429 Member
Thread Starter
Join Date: December 18, 2010
Location: NorCal
Posts: 3,708
Likes: 0
Received 0 Likes
on
0 Posts
#135
Cobra Member
Join Date: May 22, 2010
Location: Texas
Posts: 1,065
Likes: 0
Received 0 Likes
on
0 Posts
someone was wondering how backed up they are. if the first one was only built in february, then i figured that illustrated the point that they cant ahve too many Q1 cars ready in a coupe motnhs with shortages since we are in early Q2 already.
#136
Originally Posted by ShaneM
someone was wondering how backed up they are. if the first one was only built in february, then i figured that illustrated the point that they cant ahve too many Q1 cars ready in a coupe motnhs with shortages since we are in early Q2 already.
#137
Tasca Super Boss 429 Member
Thread Starter
Join Date: December 18, 2010
Location: NorCal
Posts: 3,708
Likes: 0
Received 0 Likes
on
0 Posts
0001 doesn't mean it was or wasn't the first Boss down the assembly line. It does mean it was the first Boss serialized.
We are talking about 1,000 cars per quarter. They make more Mustangs than that in a week. I don't expect production to remain behind forever. Hopefully they get caught up quickly.
We are talking about 1,000 cars per quarter. They make more Mustangs than that in a week. I don't expect production to remain behind forever. Hopefully they get caught up quickly.
#140
Cobra Member
second quater vin
I received my Vin# on 4/5/11 for a second quater allocation. last week I was told...May 4 to be delivered. Just got off the phone with Ford and the car was produced on 4/21/11 and is waiting shipment. can only sit back and wait and pray to the Boss .
Yellow blaze / recaro-Torsen Dif. Cover & Floor matts
Yellow blaze / recaro-Torsen Dif. Cover & Floor matts