2010-2014 Mustang Information on The S197 {GenII}

Window sticker codes

Thread Tools
 
Search this Thread
 
Old May 1, 2010 | 05:55 PM
  #1  
MustangBum's Avatar
Thread Starter
Member
 
Joined: April 22, 2010
Posts: 48
Likes: 0
Window sticker codes

Does anyone know what any of the code numbers mean on the window stickers, like the blend #, mine is 2586. or the #'s next to it FLR-001203 OH 120100506

Near the bottom in the box next to final assembly point is AD290 N RA 2X 115 001203 04 29 10

That last # is obviously a date, would that be the date it was shipped? I know it was built on 4/22.

Then on the very bottom right is 1201005062586 which has the last 4 digits matching the blend #

Any help is appreciated!!
Reply
Old May 1, 2010 | 06:18 PM
  #2  
corvettedreamin's Avatar
Cobra R Member
 
Joined: April 3, 2010
Posts: 1,814
Likes: 0
From: Northern VA
Originally Posted by MustangBum
Does anyone know what any of the code numbers mean on the window stickers, like the blend #, mine is 2586. or the #'s next to it FLR-001203 OH 120100506

Near the bottom in the box next to final assembly point is AD290 N RA 2X 115 001203 04 29 10

That last # is obviously a date, would that be the date it was shipped? I know it was built on 4/22.

Then on the very bottom right is 1201005062586 which has the last 4 digits matching the blend #

Any help is appreciated!!
I thought THAT was the build date.
Reply
Old May 1, 2010 | 06:24 PM
  #3  
Lancel's Avatar
Mach 1 Member
 
Joined: April 22, 2010
Posts: 903
Likes: 0
Yeah, I was under the impression that that was the build date as well. It's possible that this is the new build date after the temporary factory shutdown moved everything around.
Reply
Old May 1, 2010 | 06:35 PM
  #4  
fritzOSU03's Avatar
Mach 1 Member
 
Joined: March 25, 2010
Posts: 840
Likes: 0
From: Dallas, TX
Originally Posted by MustangBum
Does anyone know what any of the code numbers mean on the window stickers, like the blend #, mine is 2586. or the #'s next to it FLR-001203 OH 120100506

Near the bottom in the box next to final assembly point is AD290 N RA 2X 115 001203 04 29 10

That last # is obviously a date, would that be the date it was shipped? I know it was built on 4/22.

Then on the very bottom right is 1201005062586 which has the last 4 digits matching the blend #

Any help is appreciated!!
I believe 20100506 is the scheduled build date and my guess is that 04 29 10 is the date the VIN was issued.
Reply
Old May 1, 2010 | 06:43 PM
  #5  
InsidiousGT's Avatar
Bullitt Member
 
Joined: March 31, 2010
Posts: 291
Likes: 0
Originally Posted by fritzOSU03
I believe 20100506 is the scheduled build date and my guess is that 04 29 10 is the date the VIN was issued.
This is right.
Reply
Old May 1, 2010 | 10:08 PM
  #6  
MustangBum's Avatar
Thread Starter
Member
 
Joined: April 22, 2010
Posts: 48
Likes: 0
Originally Posted by InsidiousGT
This is right.
No that is not right, the dealer recieved the VIN on the 23rd. I got it on the 24th. I called Ford on the 27th and they told me the car was built on the 22nd and the ETA to the dealer is 5/8. I am thinking it was shipped on the 29th and the ETA was moved up to the 6th.
Reply
Old May 1, 2010 | 10:28 PM
  #7  
fritzOSU03's Avatar
Mach 1 Member
 
Joined: March 25, 2010
Posts: 840
Likes: 0
From: Dallas, TX
Actually it is right but they are scheduled dates which are subject to change at FoMoCo's discretion.
Reply
Old May 2, 2010 | 06:46 AM
  #8  
RMS70's Avatar
Bullitt Member
 
Joined: September 12, 2009
Posts: 261
Likes: 1
From: Chester, VA
Where are the codes that I know of: see attachment.
Attached Thumbnails Window sticker codes-ws_1zvb6a5140754_jpeg_w_codes.jpg  

Last edited by RMS70; May 2, 2010 at 06:50 AM.
Reply
Old May 2, 2010 | 09:08 AM
  #9  
InsidiousGT's Avatar
Bullitt Member
 
Joined: March 31, 2010
Posts: 291
Likes: 0
Originally Posted by fritzOSU03
Actually it is right but they are scheduled dates which are subject to change at FoMoCo's discretion.
Yar.

Technically the second number isnt the date the VIN was issued but the date the build was serialized, but close enough.

The date that matters is the top one (the build date). Take that and add what your dealer tells you is standard for their delivery (Around detriot is a couple days, most of the country is one-three weeks). And then you'll have an estimated delivery. Estimated shipping date and delivery date are not listed on window stickers.
Reply
Old May 2, 2010 | 12:01 PM
  #10  
mjbarnet's Avatar
Bullitt Member
 
Joined: January 3, 2005
Posts: 380
Likes: 0
From: Iowa City
In the attachement, is the blend/buck date the same as the build date? If so, mine will be built this week

Last edited by mjbarnet; May 2, 2010 at 12:05 PM.
Reply
Related Topics
Thread
Thread Starter
Forum
Replies
Last Post
carid
Vendor Showcase
8
May 3, 2026 05:42 AM
iliveonnitro
2015 - 2023 MUSTANG
25
Oct 7, 2021 06:31 PM
kponypower
GT
13
Jun 17, 2020 07:17 AM
austin101385
'10-14 Shelby Mustangs
3
Oct 2, 2015 01:00 PM
boz
Introductions
7
Oct 1, 2015 04:47 PM




All times are GMT -6. The time now is 02:01 PM.