Build, Delivered VIN Sequence
Thanks for the help. I guess if it's coming up "vin not found in the system " I don't have a sticker yet. I got the dora faxed from the dealer and next to the vin it has the order date of 7/20 and a date of 8/23 next to it. Would that be the manufacture date.
If you ordered on 7/20, your sticker will not be showing up for sometime. Check back on 8/16-8/17 to see if it pops up.
They usually don't schedule build dates on a dora, usually they're not scheduled until the VIN comes online and then it will have the exact build date. If you ordered on 7/20 and already have a VIN then it's already moving along very smoothly.
Can you post a pic of your DORA?
It very well could be. I just looked on my dora and it does have a section labeled "SCHD". If you have a date in that SCHD section, that is the build date. Unless there is some unseen stoppage in the next couple of weeks that results in a delay in your order, start checking a week before the 20th for your window sticker.
Needless to say, getting your VIN and schedule date in under two weeks =
It very well could be. I just looked on my dora and it does have a section labeled "SCHD". If you have a date in that SCHD section, that is the build date. Unless there is some unseen stoppage in the next couple of weeks that results in a delay in your order, start checking a week before the 20th for your window sticker.
Needless to say, getting your VIN and schedule date in under two weeks =
Hopefully Christie, you will see your GT soon! I live about 2 hours from the factory, the last day i called them, they gave me a new ETA. CS didnt even know my car had already been delivered that morning. So if your close, by the time they showed its shipped, its already there. Ronn
Last edited by Ronn; Aug 2, 2010 at 11:59 AM.
Please feel free to add me to the list as well! VIN: 144383, Ordered 7/3, no build date or ETA yet...but since I have my VIN I hope it is soon.
DORA says "Job #2" on it which I guess that means it will not be built until after 8/16. But I have read many different dates for Job 2! Is anyone absolutely sure it starts 8/16? I have read it has already started, it started today 8/2, 8/16 and 8/22. Quite the variety!
DORA says "Job #2" on it which I guess that means it will not be built until after 8/16. But I have read many different dates for Job 2! Is anyone absolutely sure it starts 8/16? I have read it has already started, it started today 8/2, 8/16 and 8/22. Quite the variety!
Please feel free to add me to the list as well! VIN: 144383, Ordered 7/3, no build date or ETA yet...but since I have my VIN I hope it is soon.
DORA says "Job #2" on it which I guess that means it will not be built until after 8/16. But I have read many different dates for Job 2! Is anyone absolutely sure it starts 8/16? I have read it has already started, it started today 8/2, 8/16 and 8/22. Quite the variety!
DORA says "Job #2" on it which I guess that means it will not be built until after 8/16. But I have read many different dates for Job 2! Is anyone absolutely sure it starts 8/16? I have read it has already started, it started today 8/2, 8/16 and 8/22. Quite the variety!
I received a new visibility update this morning. Looks like my Stang is on a train heading to Atlanta!
I called Canadian National Railways and they told me that they couldn't give me any updates. That information can only be provided to Ford. They also said they don't ship to Atlanta so it would have to switch trains somewhere. Does 13 days sound right for shipping from the plant to Atlanta?
Status
Primary
In Transit
Secondary
Shipped Rail - Railcar # ETTX711585 (Canadian National Railways )
Vehicle Location
Ramp 5P, Flat Rock, MI
Status Date / Time
Aug-03-2010, 18:00 ET
ETA
Aug-15-2010

I called Canadian National Railways and they told me that they couldn't give me any updates. That information can only be provided to Ford. They also said they don't ship to Atlanta so it would have to switch trains somewhere. Does 13 days sound right for shipping from the plant to Atlanta?
Status
Primary
In Transit
Secondary
Shipped Rail - Railcar # ETTX711585 (Canadian National Railways )
Vehicle Location
Ramp 5P, Flat Rock, MI
Status Date / Time
Aug-03-2010, 18:00 ET
ETA
Aug-15-2010
Last edited by 1969 Boss429; Aug 4, 2010 at 08:51 AM.
103653....looks like the earliest one here... Sticker says build 3/30/10
Bought and picked up 7/30. My dealer did a dealer swap, so no info on what transpired between build and delivery.., but the car had 9 miles on it when he picked it up......
Bought and picked up 7/30. My dealer did a dealer swap, so no info on what transpired between build and delivery.., but the car had 9 miles on it when he picked it up......
we all know what it feels like. especially once you drive it, and realize its more then you expected. faster, quieter, smoother, better braking, etc. how you feel when others see you driving it, and you know you are driving a legend.
this car is nowhere near as fast as my 4v turbo, but i love this one. the poor 96 hasnt had a mile on it since i got the 2011.
Last edited by assasinator; Aug 5, 2010 at 10:25 AM.



