2014 Mustang details are starting to arrive...
#141
Tasca Super Boss 429 Member
Thread Starter
Join Date: November 14, 2007
Location: Pacific NW USA
Posts: 3,652
Likes: 0
Received 8 Likes
on
6 Posts
If you have a '13 on order now and it doesn't arrive before the '14 order guide comes out, and you decide you want the '14 instead, you should easily be able to walk away from your '13 order and get your deposit refunded at most dealers. If fact, you can always walk away from a special order at most dealers, regardless of the reason.
#142
Bullitt Member
Join Date: September 8, 2012
Location: Toronto
Posts: 233
Likes: 0
Received 0 Likes
on
0 Posts
Ok thanks for the info. Probably wouldn't make much sense to wait more time to get my ride. Likely will only be some appearance items which can be added later ...
#143
Shelby GT350 Member
Join Date: February 26, 2012
Location: Down south in Dixie
Posts: 2,204
Received 390 Likes
on
287 Posts
Patrick, you say there's a Fusion in this pictu...................oh wait, there it is......sorry.
Also, I would like to see Ford use the White Platinum Metallic tri-coat on the Mustangs like that on the F-150's.
Last edited by wanted33; 10/3/12 at 02:20 PM.
#145
Bullitt Member
Join Date: December 3, 2011
Location: Mesa, AZ
Posts: 301
Likes: 0
Received 0 Likes
on
0 Posts
No more changes for 2014 that I can find yet. Just the two colors, V8 & V6 appearance packages, and discontinuation of the Boss 302 that I reported at the start of this thread.
Dates have stayed firm:
Dates have stayed firm:
- 2013's: last day to order a 2013 Mustang is 10/24/12 (it says 10/26/12 on the latest memo, but the 24th is the real cutoff - long story that doesn't matter). 2013 Mustangs will be built through 01/11/13.
- 2014's: 11/12/12 is the first day you can order a 2014 Mustang. Scheduling starts on 12/06/12 with Job 1 still TBD (probably mid to late January).
#146
Tasca Super Boss 429 Member
Thread Starter
Join Date: November 14, 2007
Location: Pacific NW USA
Posts: 3,652
Likes: 0
Received 8 Likes
on
6 Posts
Most orders take 8-10 weeks from the date of order until they arrive at the dealer. So, they usually sit in the queue unscheduled for a few weeks before they get scheduled, which would be a date a couple weeks even further out, so it is often 6-8 weeks from order to the build date. Now, keep in mind that the plant is closed for 2 weeks around the Christmas holiday, so now we're talking 8-10 weeks from date of order to the build date. That puts an October 24th order on the assembly line around the beginning of the year potentially. January 11th leaves a little extra time to finish out production completely.
#147
Bullitt Member
Join Date: December 3, 2011
Location: Mesa, AZ
Posts: 301
Likes: 0
Received 0 Likes
on
0 Posts
Most orders take 8-10 weeks from the date of order until they arrive at the dealer. So, they usually sit in the queue unscheduled for a few weeks before they get scheduled, which would be a date a couple weeks even further out, so it is often 6-8 weeks from order to the build date. Now, keep in mind that the plant is closed for 2 weeks around the Christmas holiday, so now we're talking 8-10 weeks from date of order to the build date. That puts an October 24th order on the assembly line around the beginning of the year potentially. January 11th leaves a little extra time to finish out production completely.
#148
Tasca Super Boss 429 Member
Thread Starter
Join Date: November 14, 2007
Location: Pacific NW USA
Posts: 3,652
Likes: 0
Received 8 Likes
on
6 Posts
Keep in mind that while Ford Motor Company will take orders until 10/24, each individual dealer will run out of allocation to order at different times throughout October and your local dealer might not have any left to order. For example, I have just 2 more '13 Mustangs that I can order, and that is probably down to 1 as I believe we may have ordered one for someone yesterday. It's coming down to the wire now, so if you want a '13, don't wait.
#151
Bullitt Member
Join Date: December 3, 2011
Location: Mesa, AZ
Posts: 301
Likes: 0
Received 0 Likes
on
0 Posts
#154
Bullitt Member
Join Date: December 3, 2011
Location: Mesa, AZ
Posts: 301
Likes: 0
Received 0 Likes
on
0 Posts
To a certain point I guess. Rebates tend to better at the end of the year but you will take a bigger hit resale value though. I just want to get my order in with the option of cancelling for a 2014 though.
#158
Legacy TMS Member
Join Date: June 20, 2012
Location: Central Coast California
Posts: 401
Likes: 0
Received 1 Like
on
1 Post
Body and paintshop upgrades for the new 3-Wet paint process.
As it gears up for the future, Ford to add 1,200 workers in Flat Rock
As it gears up for the future, Ford to add 1,200 workers in Flat Rock
The paint shop will be upgraded and the final trim line rebalanced to add gasoline-powered versions of the Fusion. The Fusion hybrid and Fusion Energi plug-in hybrid will be made in Mexico which has 2 1/2 times the Fusion capacity that Flat Rock will have for the sedan, but Tetreault said if demand for the hybrids escalates, Ford will look at adding them in Flat Rock.
The Lincoln MKZ is also being built in Mexico, but UAW officials hope Lincolns will be added to Flat Rock in the future.
Much of the retooling will be done during a three-week shutdown in November. By March, prototypes could be coming down the line, Gonzales said.
The Lincoln MKZ is also being built in Mexico, but UAW officials hope Lincolns will be added to Flat Rock in the future.
Much of the retooling will be done during a three-week shutdown in November. By March, prototypes could be coming down the line, Gonzales said.
#160
Cobra Member
Join Date: December 4, 2011
Location: Central Florida
Posts: 1,418
Likes: 0
Received 3 Likes
on
3 Posts
I'll keep my original plan and keep my 2011 until the '15's are out for awhile, then pick up a nice used one. After reading through this entire thread, I see no huge difference between the '13's and '14's.