What're you doing?
#1343
Legacy TMS Member
Just got finished getting the tile grout all done, corners caulked, both bottom sides caulked.
Ran out of caulk, need to get more to get the back wall bottom caulked.
Still need to trim the tub spout pipe and install the new spout, install the new trim/handle for the water valve, install the new top trim, finish some trim work around the bottom on the outside of the tub, then a new rod and curtain and it's done.
I have a new soft-close lid for the toilet waiting to be installed, and a new towel bar also waiting.
Getting closer ... I can't wait to be done with this ...
Ran out of caulk, need to get more to get the back wall bottom caulked.
Still need to trim the tub spout pipe and install the new spout, install the new trim/handle for the water valve, install the new top trim, finish some trim work around the bottom on the outside of the tub, then a new rod and curtain and it's done.
I have a new soft-close lid for the toilet waiting to be installed, and a new towel bar also waiting.
Getting closer ... I can't wait to be done with this ...
#1344
Like Father...
I ♥ Sausage
I ♥ Sausage
Just got finished getting the tile grout all done, corners caulked, both bottom sides caulked.
Ran out of caulk, need to get more to get the back wall bottom caulked.
Still need to trim the tub spout pipe and install the new spout, install the new trim/handle for the water valve, install the new top trim, finish some trim work around the bottom on the outside of the tub, then a new rod and curtain and it's done.
I have a new soft-close lid for the toilet waiting to be installed, and a new towel bar also waiting.
Getting closer ... I can't wait to be done with this ...
Ran out of caulk, need to get more to get the back wall bottom caulked.
Still need to trim the tub spout pipe and install the new spout, install the new trim/handle for the water valve, install the new top trim, finish some trim work around the bottom on the outside of the tub, then a new rod and curtain and it's done.
I have a new soft-close lid for the toilet waiting to be installed, and a new towel bar also waiting.
Getting closer ... I can't wait to be done with this ...
Loved that show.
#1346
Legacy TMS Member
Today I just finished installing the new trim kit and tub spout, touched up the grout in a few spots, touched up the caulk in a few spots, installed the new ceiling/wall trim (which may not stay, I'm kinda "meh" on it), and touched up the gaps around the outside of the tub against the walls and floor.
I still need to caulk around the base of the tub spout where it meets the wall, and around the outside of the tub where it meets the walls and floor.
But I think that's all I have left before I get a new rod and curtain and call it done.
#1351
Post *****
Join Date: December 14, 2007
Location: State of Jefferson Mountains USA
Posts: 20,005
Likes: 0
Received 4 Likes
on
4 Posts
Yeah after the winter between wood heat and kerostove heater. Should have had them in the case with a humidifier but I like seeing them out and playing once and awhile. So I let them sit in the humid bathroom for an hour, a polish with pledge, and put them in the case. Rotate out a couple of others.
#1352
A Man Just Needs Some....
Yeah after the winter between wood heat and kerostove heater. Should have had them in the case with a humidifier but I like seeing them out and playing once and awhile. So I let them sit in the humid bathroom for an hour, a polish with pledge, and put them in the case. Rotate out a couple of others.
#1358
Like Father...
I ♥ Sausage
I ♥ Sausage