What're you doing?
Just got finished getting the tile grout all done, corners caulked, both bottom sides caulked.
Ran out of caulk, need to get more to get the back wall bottom caulked.
Still need to trim the tub spout pipe and install the new spout, install the new trim/handle for the water valve, install the new top trim, finish some trim work around the bottom on the outside of the tub, then a new rod and curtain and it's done.
I have a new soft-close lid for the toilet waiting to be installed, and a new towel bar also waiting.
Getting closer ... I can't wait to be done with this ...
Ran out of caulk, need to get more to get the back wall bottom caulked.
Still need to trim the tub spout pipe and install the new spout, install the new trim/handle for the water valve, install the new top trim, finish some trim work around the bottom on the outside of the tub, then a new rod and curtain and it's done.
I have a new soft-close lid for the toilet waiting to be installed, and a new towel bar also waiting.
Getting closer ... I can't wait to be done with this ...
Like Father...
I ♥ Sausage
I ♥ Sausage





Joined: April 4, 2007
Posts: 20,164
Likes: 643
From: Just outside the middle of nowhere
Just got finished getting the tile grout all done, corners caulked, both bottom sides caulked.
Ran out of caulk, need to get more to get the back wall bottom caulked.
Still need to trim the tub spout pipe and install the new spout, install the new trim/handle for the water valve, install the new top trim, finish some trim work around the bottom on the outside of the tub, then a new rod and curtain and it's done.
I have a new soft-close lid for the toilet waiting to be installed, and a new towel bar also waiting.
Getting closer ... I can't wait to be done with this ...
Ran out of caulk, need to get more to get the back wall bottom caulked.
Still need to trim the tub spout pipe and install the new spout, install the new trim/handle for the water valve, install the new top trim, finish some trim work around the bottom on the outside of the tub, then a new rod and curtain and it's done.
I have a new soft-close lid for the toilet waiting to be installed, and a new towel bar also waiting.
Getting closer ... I can't wait to be done with this ...
Loved that show.
Today I just finished installing the new trim kit and tub spout, touched up the grout in a few spots, touched up the caulk in a few spots, installed the new ceiling/wall trim (which may not stay, I'm kinda "meh" on it), and touched up the gaps around the outside of the tub against the walls and floor.
I still need to caulk around the base of the tub spout where it meets the wall, and around the outside of the tub where it meets the walls and floor.
But I think that's all I have left before I get a new rod and curtain and call it done.
Yeah after the winter between wood heat and kerostove heater. Should have had them in the case with a humidifier but I like seeing them out and playing once and awhile. So I let them sit in the humid bathroom for an hour, a polish with pledge, and put them in the case. Rotate out a couple of others.
Yeah after the winter between wood heat and kerostove heater. Should have had them in the case with a humidifier but I like seeing them out and playing once and awhile. So I let them sit in the humid bathroom for an hour, a polish with pledge, and put them in the case. Rotate out a couple of others.
Eating dinner.
Like Father...
I ♥ Sausage
I ♥ Sausage





Joined: April 4, 2007
Posts: 20,164
Likes: 643
From: Just outside the middle of nowhere
Like Father...
I ♥ Sausage
I ♥ Sausage





Joined: April 4, 2007
Posts: 20,164
Likes: 643
From: Just outside the middle of nowhere
Like Father...
I ♥ Sausage
I ♥ Sausage





Joined: April 4, 2007
Posts: 20,164
Likes: 643
From: Just outside the middle of nowhere



he has a Boss and GT500 coming in this week for work!