Official Boss Production Began Today!
Thread Starter
Bullitt Member

Joined: November 22, 2010
Posts: 337
Likes: 0
From: Mount Pleasant, SC
Just came from the dealership: VIN 200331 is "Produced" as of 2/17. It's probably sitting on Ramp R about this point. ETA to Charleston, SC is still 14 March. Hopefully, we'll see some "Awaiting Transportation" status for a few of us in the next 24-48 hours.
I'd love to see it after it comes in. Just let me know.
EVERYONE WITH EARLY DELIVERY DATES PLEASE READ THIS:
Until your car has been assigned either a rail car number or a convoy (truck) number, it has NOT left the plant. With every new model year, ALL cars are held until such a time as there have been no build errors for 2 or 3 days. On top of that, there may have been Quality Control issues with one or more components of the earliest built cars. If that happens:
1) No one will tell you about it
2) The cars will remain at the plant until the issue is corrected
So I would recommend that you take all delivery dates with a grain of salt. I don't want to temper people's excitement about getting their cars, it's just that there were a number of people who became impatient and upset (sometimes rightly so) with the lack of information and lack of delivery of their cars at the beginning of production last year.
Because of the volume of production and the QC hold, the earliest cars are also sometimes "up against the fence", which means that ones built afterwards get shipped first once the "OK to Buy" is given.
This post from the 2011 Build, Delivered, VIN sequence thread (with ~1700 posts and 42 thousand views by people jonesing for their cars) should give you an idea of how bad it got last year. A number of cars had not been delivered until more than two months after they were built. This year should be better, as there are less changes to the powertrain for the Boss' than for all Stangs last year.
Until your car has been assigned either a rail car number or a convoy (truck) number, it has NOT left the plant. With every new model year, ALL cars are held until such a time as there have been no build errors for 2 or 3 days. On top of that, there may have been Quality Control issues with one or more components of the earliest built cars. If that happens:
1) No one will tell you about it
2) The cars will remain at the plant until the issue is corrected
So I would recommend that you take all delivery dates with a grain of salt. I don't want to temper people's excitement about getting their cars, it's just that there were a number of people who became impatient and upset (sometimes rightly so) with the lack of information and lack of delivery of their cars at the beginning of production last year.
Because of the volume of production and the QC hold, the earliest cars are also sometimes "up against the fence", which means that ones built afterwards get shipped first once the "OK to Buy" is given.
This post from the 2011 Build, Delivered, VIN sequence thread (with ~1700 posts and 42 thousand views by people jonesing for their cars) should give you an idea of how bad it got last year. A number of cars had not been delivered until more than two months after they were built. This year should be better, as there are less changes to the powertrain for the Boss' than for all Stangs last year.
Updated list as of today:
102577 built 4/7, DELIVERED 6/16, GT500, (RickyD)
103705 built 3/31, delivered 4/30 (IT_Guru)
104438 built 3/29, NOT DELIVERED
105934 built on 4/7, known to be at dealer (arrived 5/7)
106151 built on 4/8, NOT DELIVERED (Coffee Joe)
106388, built on 4/14, NOT DELIVERED (rhans)
106915 built on 4/8, DELIVERED 6/7 (knk11stang)
106991 built on 4/5, known to be at the dealer (arrived 4/27)
107230 built on 4/12, NOT DELIVERED
107556 built on 4/14, NOT DELIVERED
108266 built on 4/15, DELIVERED 5/27 (Phitchco)
108301 built on 4/15, NOT DELIVERED (TonyB84)
108307 built on 4/12, DELIVERED 5/25 (kierankelly)
108514 built on 4/15, NOT DELIVERED (enroute) (HokieCodeMonkey)
108521 built on 4/12, known to be at the dealer (arrived 4/27)
108524 built on 4/13 apparently at the dealer
108559 built 4/15, DELIVERED 5/22 (orange3.9stang)
108616 built on 4/13, DELIVERED (70elimcougar)
108630, built on 4/19, NOT DELIVERED (markski74)
108692 built on 4/13, DELIVERED 6/5 (mustang racer)
108710 built on 4/15, NOT DELIVERED (fritzOSU03)
108768 built on 4/15, NOT DELIVERED (RandyW)
108798 built on 4/14, NOT DELIVERED (super6stang)
110098 delivered on May 11th (David Young)
110168, built on 4/26, DELIVERED 5/12 (Gene K)
110172 built on 4/26, DELIVERED 5/25 (assasinator)
110273 built on 5/3, DELIVERED 5/19 (source)
110419 built on 4/26, known to be at the dealer (arrived 5/4)
110420 built on 5/3, NOT DELIVERED
110426 built on 4/26, apparently at the dealer now.
110434 built on 5/3 listed on dealer web site as Please call.
110442 built on 5/04, NOT DELIVERED, ETA is 5/15 (m4reapr)
110474 built on 4/22, NOT DELIVERED (CenturionUSA)
110659 built on 4/22, DELIVERED 5/25 (grabberguy)
110924 built on 4/21, DELIVERED 5/27 (Goldwing)
111958 built 4/21, NOT DELIVERED, ETA 5/26 (jeff s)
114049 DELIVERED 6/8
114449 built on 5/6, NOT DELIVERED (ordered 2/2) (rseantan)
114540 built on 5/10, NOT DELIVERED
114541 built on 5/11, NOT DELIVERED
114650 built on 5/4, NOT DELIVERED (dece10) GAVE UP, BOUGHT STOCK
114752 built on 5/10, NOT DELIVERED (C.T.)
115885 built on 5/4, NOT DELIVERED (RoadRanger27)
116130 built on 5/5, NOT DELIVERED (InsidiousGT)
116799 built on 5/4. NOT DELIVERED, Awaiting scheduling for transport (CorvetteDreamin)
116803 built on 5/4, NOT DELIVERED (Tyrrell-Ford P34)
116940 built on 5/5, NOT DELIVERED (eta 5/16) (2k3 Mach)
116993 built on 5/5, DELIVERED 6/17 (5.0)
117357 built on 5/6, NOT DELIVERED (dragstart)
117625 built on 4/26, DELIVERED 5/18 (JoshuaEIB)
118634 built on 5/14, NOT DELIVERED (Kahdir)
118648 built on 5/6, NOT DELIVERED (toolman33)
118649 built on 5/10, NOT DELIVERED (DontShoot)
118650 built on 5/5, SCRAPPED (rk2112)
118822 built on 5/10, NOT DELIVERED (dgreen6201)
118901 built on 05/11, DELIVERED 5/25 (Palmateer)
119033 build on 5/14, IN PROCESS (MKPony)
119188 bulit on 5/12, NOT DELIVERED (mmsnyr8120)
119457 built on 5/11. NOT DELIVERED - RAMP 51 (cimag)
119526 built on 5/14, NOT DELIVERED (zilla8)
119693 built on 5/4, NOT DELIVERED (fjg109 from AFM), SCRAPPED
120992 built on 5/18, NOT DELIVERED (stevmack)
121189 built 5/17, NOT DELIVERED (wiplash)
121481 built on 5/19, NOT DELIVERED (pony racer)
121488 built 5/20, IN TRANSIT (Rabbi Mike)
121530 built on 5/20, DELIVERED 6/10 (nsthesa)
121535 IN PROCESS (Skotty)
121644 built on 5/19, DELIVERED 6/15 (coffeejolts)
121649 built on 5/19, NOT DELIVERED (lancel)
121948 bulit on 5/20, NOT DELIVERED (Ebony5.0)
122206 built on 5/19, NOT DELIVERED (goesquik)
122243 build scheduled 5/20 (Ronn)
122723 built on 5/21, DELIVERED 6/3 (oldmanminivan)
123617 built on 6/19, NOT DELIVERED (SS05GT)
123858 built on 5/20, NOT DELIVERED (Old Shadow)
124433 build scheduled 5/24, IN PROCESS (RadioHead)
125409 built on 5/24, DELIVERED 6/14 (Zoso)
125477 built on 5/25, DELIVERED 6/11 (Racin Randy)
126283 build scheduled 5/24, IN PROCESS (mupepe)
126284 built on 5/26, NOT DELIVERED (hudson2212)
127169 built on 6/3, NOT DELIVERED, (eta 6/21) (Kabala)
127182 built on 6/1, NOT DELIVERED (Gunna66)
127183 built on 6/3, DELIVERED 6/15 (GJM20115.0)
127356 built on 6/3, DELIVERED 6/17 (GRABOID)
127387 build scheduled 5/31, IN PROCESS (ipodintampa)
127488 built on 6/3, NOT DELIVERED (eta 6/18) (jokerstars)
127579 built 6/2, NOT DELIVERED, ETA 6/27 (montreal ponies)
128002 built on 6/3, NOT DELIVERED, (eta 6/15) (Stangfoeva)
129737 build scheduled 6/7, NOT DELIVERED (windnorth)
131040 build scheduled 6/11, NOT DELIVERED (bluestang)
131408 built on 6/9, NOT DELIVERED, ETA 7/2 (raidernixon)
131454 build scheduled ???, NOT DELIVERED, ETA 6/29 (28.)
131580 built on 6/9, (ordered 5/18), NOT DELIVERED, ETA 6/19 (jay45dee)
131666 build scheduled 6/10 (ordered 5/19), NOT DELIVERED (eta 6/28) (BLUEMACH1)
134211 built on 6/9, NOT DELIVERED (Agent)
133771 built on 6/14, NOT DELIVERED, (eta 7/10) (MattR)
134819 build scheduled ???, (ordered 5/10), NOT DELIVERED (StuckInNYForever)
136243 build scheduled ???, NOT DELIVERED (eta 6/24) (lavalamp27)
138813 build scheduled 6-23, NOT DELIVERED (EddieZ)
xxxxxx built on 5/21, NOT DELIVERED (eta 6/15) (Intervention)
102577 built 4/7, DELIVERED 6/16, GT500, (RickyD)
103705 built 3/31, delivered 4/30 (IT_Guru)
104438 built 3/29, NOT DELIVERED
105934 built on 4/7, known to be at dealer (arrived 5/7)
106151 built on 4/8, NOT DELIVERED (Coffee Joe)
106388, built on 4/14, NOT DELIVERED (rhans)
106915 built on 4/8, DELIVERED 6/7 (knk11stang)
106991 built on 4/5, known to be at the dealer (arrived 4/27)
107230 built on 4/12, NOT DELIVERED
107556 built on 4/14, NOT DELIVERED
108266 built on 4/15, DELIVERED 5/27 (Phitchco)
108301 built on 4/15, NOT DELIVERED (TonyB84)
108307 built on 4/12, DELIVERED 5/25 (kierankelly)
108514 built on 4/15, NOT DELIVERED (enroute) (HokieCodeMonkey)
108521 built on 4/12, known to be at the dealer (arrived 4/27)
108524 built on 4/13 apparently at the dealer
108559 built 4/15, DELIVERED 5/22 (orange3.9stang)
108616 built on 4/13, DELIVERED (70elimcougar)
108630, built on 4/19, NOT DELIVERED (markski74)
108692 built on 4/13, DELIVERED 6/5 (mustang racer)
108710 built on 4/15, NOT DELIVERED (fritzOSU03)
108768 built on 4/15, NOT DELIVERED (RandyW)
108798 built on 4/14, NOT DELIVERED (super6stang)
110098 delivered on May 11th (David Young)
110168, built on 4/26, DELIVERED 5/12 (Gene K)
110172 built on 4/26, DELIVERED 5/25 (assasinator)
110273 built on 5/3, DELIVERED 5/19 (source)
110419 built on 4/26, known to be at the dealer (arrived 5/4)
110420 built on 5/3, NOT DELIVERED
110426 built on 4/26, apparently at the dealer now.
110434 built on 5/3 listed on dealer web site as Please call.
110442 built on 5/04, NOT DELIVERED, ETA is 5/15 (m4reapr)
110474 built on 4/22, NOT DELIVERED (CenturionUSA)
110659 built on 4/22, DELIVERED 5/25 (grabberguy)
110924 built on 4/21, DELIVERED 5/27 (Goldwing)
111958 built 4/21, NOT DELIVERED, ETA 5/26 (jeff s)
114049 DELIVERED 6/8
114449 built on 5/6, NOT DELIVERED (ordered 2/2) (rseantan)
114540 built on 5/10, NOT DELIVERED
114541 built on 5/11, NOT DELIVERED
114650 built on 5/4, NOT DELIVERED (dece10) GAVE UP, BOUGHT STOCK
114752 built on 5/10, NOT DELIVERED (C.T.)
115885 built on 5/4, NOT DELIVERED (RoadRanger27)
116130 built on 5/5, NOT DELIVERED (InsidiousGT)
116799 built on 5/4. NOT DELIVERED, Awaiting scheduling for transport (CorvetteDreamin)
116803 built on 5/4, NOT DELIVERED (Tyrrell-Ford P34)
116940 built on 5/5, NOT DELIVERED (eta 5/16) (2k3 Mach)
116993 built on 5/5, DELIVERED 6/17 (5.0)
117357 built on 5/6, NOT DELIVERED (dragstart)
117625 built on 4/26, DELIVERED 5/18 (JoshuaEIB)
118634 built on 5/14, NOT DELIVERED (Kahdir)
118648 built on 5/6, NOT DELIVERED (toolman33)
118649 built on 5/10, NOT DELIVERED (DontShoot)
118650 built on 5/5, SCRAPPED (rk2112)
118822 built on 5/10, NOT DELIVERED (dgreen6201)
118901 built on 05/11, DELIVERED 5/25 (Palmateer)
119033 build on 5/14, IN PROCESS (MKPony)
119188 bulit on 5/12, NOT DELIVERED (mmsnyr8120)
119457 built on 5/11. NOT DELIVERED - RAMP 51 (cimag)
119526 built on 5/14, NOT DELIVERED (zilla8)
119693 built on 5/4, NOT DELIVERED (fjg109 from AFM), SCRAPPED
120992 built on 5/18, NOT DELIVERED (stevmack)
121189 built 5/17, NOT DELIVERED (wiplash)
121481 built on 5/19, NOT DELIVERED (pony racer)
121488 built 5/20, IN TRANSIT (Rabbi Mike)
121530 built on 5/20, DELIVERED 6/10 (nsthesa)
121535 IN PROCESS (Skotty)
121644 built on 5/19, DELIVERED 6/15 (coffeejolts)
121649 built on 5/19, NOT DELIVERED (lancel)
121948 bulit on 5/20, NOT DELIVERED (Ebony5.0)
122206 built on 5/19, NOT DELIVERED (goesquik)
122243 build scheduled 5/20 (Ronn)
122723 built on 5/21, DELIVERED 6/3 (oldmanminivan)
123617 built on 6/19, NOT DELIVERED (SS05GT)
123858 built on 5/20, NOT DELIVERED (Old Shadow)
124433 build scheduled 5/24, IN PROCESS (RadioHead)
125409 built on 5/24, DELIVERED 6/14 (Zoso)
125477 built on 5/25, DELIVERED 6/11 (Racin Randy)
126283 build scheduled 5/24, IN PROCESS (mupepe)
126284 built on 5/26, NOT DELIVERED (hudson2212)
127169 built on 6/3, NOT DELIVERED, (eta 6/21) (Kabala)
127182 built on 6/1, NOT DELIVERED (Gunna66)
127183 built on 6/3, DELIVERED 6/15 (GJM20115.0)
127356 built on 6/3, DELIVERED 6/17 (GRABOID)
127387 build scheduled 5/31, IN PROCESS (ipodintampa)
127488 built on 6/3, NOT DELIVERED (eta 6/18) (jokerstars)
127579 built 6/2, NOT DELIVERED, ETA 6/27 (montreal ponies)
128002 built on 6/3, NOT DELIVERED, (eta 6/15) (Stangfoeva)
129737 build scheduled 6/7, NOT DELIVERED (windnorth)
131040 build scheduled 6/11, NOT DELIVERED (bluestang)
131408 built on 6/9, NOT DELIVERED, ETA 7/2 (raidernixon)
131454 build scheduled ???, NOT DELIVERED, ETA 6/29 (28.)
131580 built on 6/9, (ordered 5/18), NOT DELIVERED, ETA 6/19 (jay45dee)
131666 build scheduled 6/10 (ordered 5/19), NOT DELIVERED (eta 6/28) (BLUEMACH1)
134211 built on 6/9, NOT DELIVERED (Agent)
133771 built on 6/14, NOT DELIVERED, (eta 7/10) (MattR)
134819 build scheduled ???, (ordered 5/10), NOT DELIVERED (StuckInNYForever)
136243 build scheduled ???, NOT DELIVERED (eta 6/24) (lavalamp27)
138813 build scheduled 6-23, NOT DELIVERED (EddieZ)
xxxxxx built on 5/21, NOT DELIVERED (eta 6/15) (Intervention)
Last edited by PTRocks; Feb 21, 2011 at 12:38 PM.
Thread Starter
Bullitt Member

Joined: November 22, 2010
Posts: 337
Likes: 0
From: Mount Pleasant, SC
PTRocks: I know, I'm just reporting my status as it updates. Produced means produced. Went through this exact same process 18 months ago with a GT500; it was a learning experience. That car was on the lot long enough for a friend that works for Ford to take pictures of it before they put on the drivers side GT500 stripe! It spent 45 days in QC hold: I was losing my mind.
Thanks Fred!!
BossLS: yours must be hauling the mail! Of course they don't necessarily produce in serial # order, so even though your number is higher it may have been produced first. Though I wouldn't be surprised if mine showed "In Transit" now, my "Produced" status was a couple of working days ago.....
Berol: you betcha!!!!
Thanks Fred!!
BossLS: yours must be hauling the mail! Of course they don't necessarily produce in serial # order, so even though your number is higher it may have been produced first. Though I wouldn't be surprised if mine showed "In Transit" now, my "Produced" status was a couple of working days ago.....
Berol: you betcha!!!!
PTRocks: I know, I'm just reporting my status as it updates. Produced means produced. Went through this exact same process 18 months ago with a GT500; it was a learning experience. That car was on the lot long enough for a friend that works for Ford to take pictures of it before they put on the drivers side GT500 stripe! It spent 45 days in QC hold: I was losing my mind.
Just sayin'.
Like PT said, until you get an actual railcar # with a shipped status, it's best to restrain your enthusiasm; it still may be a month away from arriving.
My production week was 2/28. The sticker came up this morning. Talked to sales person and she looked it up on their computer and it said it was in production, and I know that means nothing! Until is rolls off he line. I changed my order from Customer to stock order at the advice of my sales person. She said they would get pulled first waiting for a clean run. She has been right on so far.
Yes, and while that was sitting there all that time its status was "produced" and had an awaiting shipment status.
Just sayin'.
Like PT said, until you get an actual railcar # with a shipped status, it's best to restrain your enthusiasm; it still may be a month away from arriving.
Just sayin'.
Like PT said, until you get an actual railcar # with a shipped status, it's best to restrain your enthusiasm; it still may be a month away from arriving.
It is my understanding that is one of the things Ford changed this year, one of our insiders can confirm this.



