2015 Ordered/Built/Delivered Thread
#141
GT Member
Join Date: March 2, 2014
Location: Phoenix, AZ
Posts: 126
Likes: 0
Received 0 Likes
on
0 Posts
#143
2015 Stang
I am curious however about the scheduling. I'm confused about how the whole scheduling thing works. I would've thought it would be non-stop with all the orders they must have. Why are there stops in scheduling?
#144
Member
Join Date: October 6, 2014
Location: California
Posts: 14
Likes: 0
Received 0 Likes
on
0 Posts
PM'd you, thanks again Deysha
#146
NOT CURRENTLY ACTIVE ON THIS SITE! DO NOT USE PM FEATURE!
Join Date: October 25, 2010
Location: Dearborn, MI
Posts: 5,279
Likes: 0
Received 16 Likes
on
14 Posts
I sent you a response yesterday, disneyfun1.
I received your PM, Dougxox. I’ll get back to you as soon as possible.
You’re very welcome, Wire Paladin. This is a whole new model, and this process has not been like all other normal years. All I can ask for is patience with this MY.
Thanks, Bullitt 2015! I’ll get back to you soon.
Deysha
I received your PM, Dougxox. I’ll get back to you as soon as possible.
I just want to reiterate the above....Many Thanks for tracking my 15's journey to the west coast.
I am curious however about the scheduling. I'm confused about how the whole scheduling thing works. I would've thought it would be non-stop with all the orders they must have. Why are there stops in scheduling?
I am curious however about the scheduling. I'm confused about how the whole scheduling thing works. I would've thought it would be non-stop with all the orders they must have. Why are there stops in scheduling?
Thanks, Bullitt 2015! I’ll get back to you soon.
Deysha
#147
Cobra R Member
Join Date: July 9, 2006
Location: Hillsboro MO, just south of St. Louis
Posts: 1,763
Likes: 0
Received 3 Likes
on
3 Posts
Hmm, Disneyfun, I see yours got ordered on 6/13 and you have a dora, vin and even a build date. mine was ordered 6/5 and I have nothing yet.
Thought the SE's were to be the first off the line.
Thought the SE's were to be the first off the line.
Last edited by Dougxox; 10/8/14 at 02:06 PM.
#149
GT Member
Join Date: March 2, 2014
Location: Phoenix, AZ
Posts: 126
Likes: 0
Received 0 Likes
on
0 Posts
i dont know about the limited editions being first. my dealer ordered mine as dealer stock instead of special order for me. it shows built and an eta of 10/20, but i dont think it will make that since it has not shipped yet and has to come to AZ. hopefully i get it soon!
#150
Bullitt Member
Join Date: April 21, 2011
Location: Santa Clarita, CA
Posts: 482
Likes: 0
Received 0 Likes
on
0 Posts
Well, so far I'm living the charmed life... I hope everything stays on track.
1. I ordered my Metallic GT +PP +Recaros on June 27
2. Approximately a month or so ago my dealer changed to a "Stock" order which somehow moved it up in the line quite a bit.
3. I received my VIN about 2 1/2 weeks ago and a "Scheduled to week" saying 10/13
4. Then a few days ago the status changed to "Scheduled to date" saying 10/15
5. Today the status page updated to "In Production" and a status of "Sent to Plant" in the source code - while maintaining a 10/15 production date.
6. COTUS is down at the moment but expecting a Window Sticker when it comes back up
Not trying to rub it in to all those waiting but hoping this will give you an idea of the steps you're likely to see/experience.
1. I ordered my Metallic GT +PP +Recaros on June 27
2. Approximately a month or so ago my dealer changed to a "Stock" order which somehow moved it up in the line quite a bit.
3. I received my VIN about 2 1/2 weeks ago and a "Scheduled to week" saying 10/13
4. Then a few days ago the status changed to "Scheduled to date" saying 10/15
5. Today the status page updated to "In Production" and a status of "Sent to Plant" in the source code - while maintaining a 10/15 production date.
6. COTUS is down at the moment but expecting a Window Sticker when it comes back up
Not trying to rub it in to all those waiting but hoping this will give you an idea of the steps you're likely to see/experience.
#152
NOT CURRENTLY ACTIVE ON THIS SITE! DO NOT USE PM FEATURE!
Join Date: October 25, 2010
Location: Dearborn, MI
Posts: 5,279
Likes: 0
Received 16 Likes
on
14 Posts
-the priority code rating
-the dealer's allocation for each production week
-the ordered option content
-the receipt date
The receipt date is a factor when breaking ties for orders with the same priority code. Therefore, the date is the last factor.
i dont know about the limited editions being first. my dealer ordered mine as dealer stock instead of special order for me. it shows built and an eta of 10/20, but i dont think it will make that since it has not shipped yet and has to come to AZ. hopefully i get it soon!
Deysha
#153
Bullitt Member
Join Date: April 21, 2011
Location: Santa Clarita, CA
Posts: 482
Likes: 0
Received 0 Likes
on
0 Posts
Hey Rich, Nah, we sold both the '12 and '13 Laguna Secas we had. We're maintaining a '12 LS we set up for the track - pretty much a dedicated track car. We're also maintaining a 2013 Boss 302S out at the track (sweet car!). Loved the LS's but when chasing down an current year M3, you could just see the M3's IRS working. As soon as Ford Mustang chief said 2015 GT's would be Boss 302 track times it was the death knell for my LS's! LOL
#154
Bullitt Member
well, somewhat confused.
dont know how this is supposed to work, so I have no reference point.
I would like to know what the wait is. My dealer ordered in early June, and so far nuthin!
Any movement would be appreciated!
dont know how this is supposed to work, so I have no reference point.
I would like to know what the wait is. My dealer ordered in early June, and so far nuthin!
Any movement would be appreciated!
#156
NOT CURRENTLY ACTIVE ON THIS SITE! DO NOT USE PM FEATURE!
Join Date: October 25, 2010
Location: Dearborn, MI
Posts: 5,279
Likes: 0
Received 16 Likes
on
14 Posts
Deysha
#158
Member
Join Date: October 6, 2014
Location: California
Posts: 14
Likes: 0
Received 0 Likes
on
0 Posts
#159
GT Member
Join Date: March 2, 2014
Location: Phoenix, AZ
Posts: 126
Likes: 0
Received 0 Likes
on
0 Posts
mines been built since 9/26 but still has not shipped, eta date is monday 10/20, so i guess it wont make that. i know there is an issue with some 5.0 cars catalytic convertors, dont know if mine is one of them they have to fix or not yet.