VIN, Build, Delivered: The 2012 Edition
I'll be 8 weeks Jan 24 and the General Manager is figuring late April-Mid May delivery. A good shift usually produces 350-400 cars a shift. I believe AAI is on 1 shift, 8 hours, 5 days. Won't take them long to build a wack of cars once the OKTB is given. Just my FWIW crystal ball speculation.
And heres the bright side. Since AAI is right in snow territory, by the time ours get built, the likely hood or our cars getting snowed on becomes smaller and smaller
And heres the bright side. Since AAI is right in snow territory, by the time ours get built, the likely hood or our cars getting snowed on becomes smaller and smaller
I hope you are right about the weather, but with this weather I am thinking it may be May before the snow stops. Unfortunately I am not a patient person and this is my second Mustang that I have ordered in less than 6 months so I hope it goes quickly. I really want my car!
I'm still not scheduled. I ordered 1/3/11 and gave it a little bit when they told me March. I wanna take the car on a trip in early May now I am getting a little worried,,I am just hoping for mid April!
I ordered mine about two weeks ago. Got a call today saying that "they are delayed a couple of weeks." Boo.
Details:
2012 Mustang GT Premium 401A
Red Candy Metallic
Black w/ Cashmere Accents
6-Spd. Manual w/ 3.55 Rear
Brembo Brakes
Glass Roof
Comfort Package
Security Package
Chin Spoiler
Anyone understand what priority 10 means?
Details:
2012 Mustang GT Premium 401A
Red Candy Metallic
Black w/ Cashmere Accents
6-Spd. Manual w/ 3.55 Rear
Brembo Brakes
Glass Roof
Comfort Package
Security Package
Chin Spoiler
Anyone understand what priority 10 means?
Just talked to my sales person and she said 3 2012 5.0's came in today!! She went out to see if the Kona Blue one was mine....... it wasn't. They were 5.0's. Sounds like they opened the gates!




and it keeps coming