2005-2009 Mustang Information on The S197 {Gen1}

If i change order to Sport appearance package

Old Dec 19, 2004 | 12:58 PM
  #1  
94tbird's Avatar
Thread Starter
Legacy TMS Member
 
Joined: November 10, 2004
Posts: 2,483
Likes: 0
just wodering cause ive seen the aftermarket IUP things n they look great as long as they r installed with time and care and without distraction
Reply
Old Dec 19, 2004 | 01:12 PM
  #2  
Galaxie's Avatar
I Have Admin Envy
 
Joined: January 30, 2004
Posts: 6,740
Likes: 1
obviously yes, if you select ISAP, they will build the car quicker, becaust there is no material hold on that option package.

Think for a second about it, make sure you will be happy with IUP Lite, I personally would rather wait a month or two longer and get exactly what I want.
Reply
Old Dec 19, 2004 | 01:42 PM
  #3  
94tbird's Avatar
Thread Starter
Legacy TMS Member
 
Joined: November 10, 2004
Posts: 2,483
Likes: 0
well u always got the aftermarket kits too ya know n they look jsut as good if installed properly. i jsut dont want to wait 3 months and then tell me oh ur car is here without the IUP. if thats the case i could get the car now n do the aftermarket ya know??
Reply
Old Dec 19, 2004 | 02:15 PM
  #4  
BEACHBOY's Avatar
Mach 1 Member
 
Joined: November 12, 2004
Posts: 747
Likes: 0
Hey Ron are you stillgoing to get the dark charcoal interior if you opt out of IUP?

A question to the masses, how much work is involved in changing the shifter to the one offered in the IUP light? What do you think the cost would be? And is it somethink a guy good with tools can do himself? I know if I ever opt for the steering wheel upgrade a dealer will be doing that, no need for an airbag in the face..........
Reply
Old Dec 19, 2004 | 02:39 PM
  #5  
Giddyup's Avatar
Cobra R Member
 
Joined: November 10, 2004
Posts: 1,601
Likes: 0
Originally posted by 94tbird@December 19, 2004, 12:45 PM
well u always got the aftermarket kits too ya know n they look jsut as good if installed properly. i jsut dont want to wait 3 months and then tell me oh ur car is here without the IUP. if thats the case i could get the car now n do the aftermarket ya know??
Ron....are the aftermarket trim pieces the type that go on over the top of existing trim, or is it that the existing trim is removed and replaced with the new trim pieces? :scratch: My personal preferrence is not having the 'veneered' method. If you truly want IUP, then wait it out for awhile and see if this is something other than Ford trying to force-feed everybody what they don't want. At least it's Winter time right now.....and a wait is a little bit easier than if it were Spring/Summer right now. Bottom line Ron......Don't 'Settle For'.
Reply
Old Dec 19, 2004 | 02:51 PM
  #6  
05stangkc's Avatar
Administrator clevparts@aol.com
 
Joined: November 27, 2004
Posts: 12,593
Likes: 4,345
From: Visalia Ca.
Piece by Piece is a losing proposition The Wheel itself will cost u as much as the 18r Option! It's a tough Choice! I caved in and took a non IUP auto vs the Stick IUP car! I love it but when the other car Hits The Dealership where I work we See How Much I squirm! If you are going to Keep this car a long Time I would say wait! But if you are going to trade up every Year then I would consider an Alternative! There Should be hotter and hotter Models coming out every Year at Least for a while! Hope this Helps!
Reply
Old Dec 19, 2004 | 03:05 PM
  #7  
rex's Avatar
rex
Mach 1 Member
 
Joined: October 16, 2004
Posts: 573
Likes: 0
beside ssinserts who else is offering IUP products?
Reply
Old Dec 19, 2004 | 03:59 PM
  #8  
Galaxie's Avatar
I Have Admin Envy
 
Joined: January 30, 2004
Posts: 6,740
Likes: 1
Originally posted by rex@December 19, 2004, 5:08 PM
beside ssinserts who else is offering IUP products?
Give it a month or two, the aftermarket will have quite a few vendors.
Reply
Old Dec 19, 2004 | 08:21 PM
  #9  
Mustang69-05's Avatar
Cobra Member
 
Joined: November 23, 2004
Posts: 1,001
Likes: 0
This whole situation sux.....
Reply
Old Dec 19, 2004 | 08:31 PM
  #10  
OSUstangfan's Avatar
Bullitt Member
 
Joined: September 7, 2004
Posts: 415
Likes: 0
woodview automotive is another aftermarket company doing the aluminum inserts. I personally would choose them over ssinserts because you can order individual pieces so you're not left with a lot of unnecessary parts. I have to admit im leaning towards aftermarket. I like the IUP, but i also like to drive, and my car is already sold. And the pics ive seen of the aftermarket doesnt look half bad.
Reply
Related Topics
Thread
Thread Starter
Forum
Replies
Last Post
HizliBullet
GT350
14
Nov 14, 2015 08:59 AM
CoyotePremium13
2010-2014 Mustang
40
Aug 18, 2015 07:28 AM
Michael Follett
2005-2009 Mustang
4
Jul 24, 2015 06:58 AM
Coyote5-0
GT
6
Jul 17, 2015 03:47 PM


Thread Tools
Search this Thread

All times are GMT -6. The time now is 06:56 PM.