How can I determine the actual build date?
#1
Bullitt Member
![](https://themustangsource.com/forums/images/rank.gif)
Thread Starter
![Thumbs up](https://themustangsource.com/forums/images/icons/icon14.gif)
Door jamb says only 3/2005. On the window sticker, at the bottom right, there is a series of numbers ending with 03 16 05. Is that the build date or is there someplace else i can find it?
TIA :worship:
TIA :worship:
#3
Mach 1 Member
![](https://themustangsource.com/forums/images/rank.gif)
![](https://themustangsource.com/forums/images/rank.gif)
I received an extra piece of paper with my car, it was some sort of factory release paperwork. The dealer didn't know what it was and asked me if I wanted it, I said sure. After looking it over, it looks as though this piece of paper is the final "OK, the car is done and officially built" paperwork that is performed as the car is rolling off the assembly line.
If that is the case, my car was "born" March 16th at 3:28AM. Not sure if they are running around the clock though, so I may be assuming something that just isn't possible.
If anyone can confirm that they are running all night long at Flat Rock, and if anyone is interested, I'd be happy to scan that piece of paper and post it to see if anyone else has one.
Regardless, I don't think you can have a car with a build "day" as they take something like 60 hours to build from start to finish. Might be wrong on that one too, but I seem to remember hearing that.
Sean
If that is the case, my car was "born" March 16th at 3:28AM. Not sure if they are running around the clock though, so I may be assuming something that just isn't possible.
If anyone can confirm that they are running all night long at Flat Rock, and if anyone is interested, I'd be happy to scan that piece of paper and post it to see if anyone else has one.
Regardless, I don't think you can have a car with a build "day" as they take something like 60 hours to build from start to finish. Might be wrong on that one too, but I seem to remember hearing that.
Sean
#6
Originally posted by wild stray@April 17, 2005, 10:50 PM
People on here say the dealer pulls a report when your car is in for service (Oasis Report), which shows your actual build date.
Paul
People on here say the dealer pulls a report when your car is in for service (Oasis Report), which shows your actual build date.
Paul
I pulled your oasis report for you (I still had your VIN in my PM). Here's a screen shot of it. Says your build date is 3/22/05.
Here it is:
OASIS RESULT: 1ZVFT82H555186001
04/18/2005 15:51:14
© Copyright 2002-2005 Ford Motor Company. All rights reserved.
VEHICLE INFORMATION
VEHICLE DESCRIPTION: 2005 MUSTANG
BODY STYLE: 2 DOOR COUPE GT
ENGINE: 4.6L 3V SOHC
TRANSMISSION: T3650 5-SPEED MANUAL
AXLE CODE: CD
ENGINE CALIBRATION: 5ZF2G80A
GENERAL WARRANTY INFORMATION
WARRANTY START DATE: 03/31/2005
BUILD DATE: 03/22/2005
SALE MILEAGE: 00004
WARNING MESSAGES: LESS THAN TWO DEALER APPROVED AWA REPAIR VISITS PAID TO DATE
OUTSTANDING FIELD SERVICE ACTIONS: NO CAMPAIGN MESSAGE(S) FOUND
EXTENDED COVERAGES: NO ESP INFORMATION AVAILABLE
REPAIR HISTORY: NO REPAIR HISTORY ON VEHICLE
END OF OASIS REPORT FOR 1ZVFT82H555186001
Valerie
#7
Bullitt Member
![](https://themustangsource.com/forums/images/rank.gif)
Thread Starter
Thanks for that Valerie. I still have to take it in for the differential work...everything else is great
Interesting how that warranty started a week before i took delivery!
![Banana](https://themustangsource.com/forums/images/smilies/banana.gif)
Thread
Thread Starter
Forum
Replies
Last Post