FYI.

I have recently learned that Integrated Build Vehicles (which are going to start being built this week) ARE sellable vehicles. So, those of you with Pre Sept. 7th Build dates, it IS entirely possible yours may be built before Sept 7.

Whether or not it ships and you receive early remains to be seen. Chances are, they will go over them with a fine tooth comb after they are built, so you may not receive them any sooner than a post job 1 car. This portion is my speculation, so please don't take as the absolute truth.
Reply
Old Aug 15, 2004 | 03:24 PM
  #2  
V10's Avatar
V10
Shelby GT350 Member
 
Joined: March 11, 2004
Posts: 2,146
Likes: 1
Thanks for the info. I assume that parts coming from suppliers will be a limiting factor in how fast you can ramp up production.
Reply
Old Aug 15, 2004 | 03:32 PM
  #3  
bullittman's Avatar
Mach 1 Member
 
Joined: January 29, 2004
Posts: 786
Likes: 0
thanks for the info........Please keep us posted as best you can! :worship:
Reply
Old Aug 15, 2004 | 03:34 PM
  #4  
ZERO's Avatar
Team Mustang Source
 
Joined: April 19, 2004
Posts: 816
Likes: 0
sweet. thanks for the info. speculation or not, it's always nice to hear what's going on.

Reply
Old Aug 15, 2004 | 05:09 PM
  #5  
AAI_T&F's Avatar
Thread Starter
Member
 
Joined: June 6, 2004
Posts: 24
Likes: 0
Originally posted by V10@August 15, 2004, 3:27 PM
Thanks for the info. I assume that parts coming from suppliers will be a limiting factor in how fast you can ramp up production.
That could definately be an issue, but it is my understanding that the suppliers are ready. I'm sure there will be problems, but that's what this integrated build is for. The storm before the storm! These cars will receive more personal attention than a car will after Job 1, so don't think your car won't be a quality built car, if you're one of the people with pre sept. 7 build dates!!!

I believe the Integrated Build number is something like 330-340 until Job 1, somewhere in there, with the daily build count increasing every day.

This is it guys! We're in the final stretch. It won't be long before YOUR 'stangs are rolling off the end of the line!
Reply
Old Aug 15, 2004 | 05:53 PM
  #6  
conv_stang's Avatar
Shelby GT500 Member
 
Joined: March 3, 2004
Posts: 2,634
Likes: 0
From: Richmond VA
yeah man! just wish i had ordered one. or wish they already released vert info. and were building them. i just miss my vert too much to go with a coupe for now. might change in the near future though!
Reply
Old Aug 15, 2004 | 06:03 PM
  #7  
mr-mstng's Avatar
GTR Member
 
Joined: January 30, 2004
Posts: 4,743
Likes: 4
From: NE PA
AAI T&F, Thank you very much for for your info! :worship:
Reply
Old Aug 15, 2004 | 06:05 PM
  #8  
order#1's Avatar
Bullitt Member
 
Joined: June 14, 2004
Posts: 314
Likes: 0
Originally posted by mr-mstng@August 15, 2004, 6:06 PM
AAI T&F, Thank you very much for for your info! :worship:
DITTO!!!!!!!!!
Reply
Old Aug 15, 2004 | 07:57 PM
  #9  
V10's Avatar
V10
Shelby GT350 Member
 
Joined: March 11, 2004
Posts: 2,146
Likes: 1
Originally posted by AAI_T&F@August 15, 2004, 5:12 PM
I believe the Integrated Build number is something like 330-340 until Job 1, somewhere in there, with the daily build count increasing every day.

That's great news, looks like things are moving ahead of schedule!
Reply
Old Aug 15, 2004 | 08:14 PM
  #10  
os121's Avatar
Team Mustang Source
 
Joined: February 8, 2004
Posts: 595
Likes: 0
Originally posted by AAI_T&F@August 15, 2004, 5:12 PM
I believe the Integrated Build number is something like 330-340 until Job 1, somewhere in there, with the daily build count increasing every day.

This is it guys! We're in the final stretch. It won't be long before YOUR 'stangs are rolling off the end of the line!
AAI_T&F, thanks so much for the information. It is so interesting to hear information related to the manufacturing of the new Mustang. We have waited so long for the production start date. I am curious, is the Integrated Build Number an estimate of the number of cars built per day leading up to Job 1 ? Thanks again ! :worship:
Reply
Old Aug 16, 2004 | 03:08 PM
  #11  
AAI_T&F's Avatar
Thread Starter
Member
 
Joined: June 6, 2004
Posts: 24
Likes: 0
Originally posted by os121+August 15, 2004, 8:17 PM--></div><table border='0' align='center' width='95%' cellpadding='3' cellspacing='1'><tr><td>QUOTE (os121 @ August 15, 2004, 8:17 PM)</td></tr><tr><td id='QUOTE'><!--QuoteBegin-AAI_T&F@August 15, 2004, 5:12 PM
I believe the Integrated Build number is something like 330-340 until Job 1, somewhere in there, with the daily build count increasing every day.

This is it guys! We're in the final stretch. It won't be long before YOUR 'stangs are rolling off the end of the line!
AAI_T&F, thanks so much for the information. It is so interesting to hear information related to the manufacturing of the new Mustang. We have waited so long for the production start date. I am curious, is the Integrated Build Number an estimate of the number of cars built per day leading up to Job 1 ? Thanks again ! :worship:[/b][/quote]
There will be an increase in the number of Mustangs built each day up until Job 1. The total "Integrated Build" number is somewhere between 330-340 cars. So, in other words, from Today (Monday August 16th) until Sept. 7th, 330-340 mustangs will be built, with the daily build number increasing as the days go along.

Reply
Old Aug 16, 2004 | 03:13 PM
  #12  
AAI_T&F's Avatar
Thread Starter
Member
 
Joined: June 6, 2004
Posts: 24
Likes: 0
For those of you interested in some info on the Plant itself, checkout the AAI website at:

AAI Website

Not ALOT of info, but there is some stuff for you diehards...
Reply
Old Aug 16, 2004 | 04:49 PM
  #13  
kevinb120's Avatar
Team Mustang Source
 
Joined: January 29, 2004
Posts: 6,730
Likes: 3
Originally posted by AAI_T&F+August 15, 2004, 6:12 PM--></div><table border='0' align='center' width='95%' cellpadding='3' cellspacing='1'><tr><td>QUOTE (AAI_T&F @ August 15, 2004, 6:12 PM)</td></tr><tr><td id='QUOTE'> <!--QuoteBegin-V10@August 15, 2004, 3:27 PM
Thanks for the info. I assume that parts coming from suppliers will be a limiting factor in how fast you can ramp up production.
That could definately be an issue, but it is my understanding that the suppliers are ready. I'm sure there will be problems, but that's what this integrated build is for. The storm before the storm! These cars will receive more personal attention than a car will after Job 1, so don't think your car won't be a quality built car, if you're one of the people with pre sept. 7 build dates!!!

I believe the Integrated Build number is something like 330-340 until Job 1, somewhere in there, with the daily build count increasing every day.

This is it guys! We're in the final stretch. It won't be long before YOUR 'stangs are rolling off the end of the line! [/b][/quote]
here ya go:


STK/ORD# 5T821002 05 MUSTANG GT COUPE PRODUCTION
REF0TBF BODYSIZE I
EXT/INT CLR HP PERFORM WHITE/ KR DK CARC LEATHER/RED AC #CYL MPG
SERIAL# 1ZVHT82H855100382 LOCATION LIST PRICE
MFR STAT BUCKED SCHED DATE 06/07/2005 STAT DATE 08/06/2004
ORD
OPTIONAL EQUIPMENT
PKG 140A MUSTANG GT PREM COUPE
MUSTANG GT PREM COUPE

918 SHAKER 1000 AUDIO SYSTEM 14A ACTIVE ANTI THEFT
68R INTERIOR COLOR PKG 18G INTERIOR UPGRADE PACKAGE
13D REAR SPOLIER B04 PRE JOB 1
17L WHEEL LOCK KIT 43A FRONT SIDE AIRBAGS
64D 15 INCH STEEL WHEEL
Reply
Related Topics
Thread
Thread Starter
Forum
Replies
Last Post
carid
Vendor Showcase
7
Today 01:07 PM
dbent15
Fox Mustangs
4
Sep 5, 2015 12:15 PM




All times are GMT -6. The time now is 04:13 PM.