Integrated Build
FYI.
I have recently learned that Integrated Build Vehicles (which are going to start being built this week) ARE sellable vehicles. So, those of you with Pre Sept. 7th Build dates, it IS entirely possible yours may be built before Sept 7.
Whether or not it ships and you receive early remains to be seen. Chances are, they will go over them with a fine tooth comb after they are built, so you may not receive them any sooner than a post job 1 car. This portion is my speculation, so please don't take as the absolute truth.
I have recently learned that Integrated Build Vehicles (which are going to start being built this week) ARE sellable vehicles. So, those of you with Pre Sept. 7th Build dates, it IS entirely possible yours may be built before Sept 7.
Whether or not it ships and you receive early remains to be seen. Chances are, they will go over them with a fine tooth comb after they are built, so you may not receive them any sooner than a post job 1 car. This portion is my speculation, so please don't take as the absolute truth.
Originally posted by V10@August 15, 2004, 3:27 PM
Thanks for the info. I assume that parts coming from suppliers will be a limiting factor in how fast you can ramp up production.
Thanks for the info. I assume that parts coming from suppliers will be a limiting factor in how fast you can ramp up production.
I believe the Integrated Build number is something like 330-340 until Job 1, somewhere in there, with the daily build count increasing every day.
This is it guys! We're in the final stretch. It won't be long before YOUR 'stangs are rolling off the end of the line!
yeah man! just wish i had ordered one. or wish they already released vert info. and were building them. i just miss my vert too much to go with a coupe for now. might change in the near future though!
Originally posted by AAI_T&F@August 15, 2004, 5:12 PM
I believe the Integrated Build number is something like 330-340 until Job 1, somewhere in there, with the daily build count increasing every day.
I believe the Integrated Build number is something like 330-340 until Job 1, somewhere in there, with the daily build count increasing every day.
Originally posted by AAI_T&F@August 15, 2004, 5:12 PM
I believe the Integrated Build number is something like 330-340 until Job 1, somewhere in there, with the daily build count increasing every day.
This is it guys! We're in the final stretch. It won't be long before YOUR 'stangs are rolling off the end of the line!
I believe the Integrated Build number is something like 330-340 until Job 1, somewhere in there, with the daily build count increasing every day.
This is it guys! We're in the final stretch. It won't be long before YOUR 'stangs are rolling off the end of the line!
Originally posted by os121+August 15, 2004, 8:17 PM--></div><table border='0' align='center' width='95%' cellpadding='3' cellspacing='1'><tr><td>QUOTE (os121 @ August 15, 2004, 8:17 PM)</td></tr><tr><td id='QUOTE'><!--QuoteBegin-AAI_T&F@August 15, 2004, 5:12 PM
I believe the Integrated Build number is something like 330-340 until Job 1, somewhere in there, with the daily build count increasing every day.
This is it guys! We're in the final stretch. It won't be long before YOUR 'stangs are rolling off the end of the line!
I believe the Integrated Build number is something like 330-340 until Job 1, somewhere in there, with the daily build count increasing every day.
This is it guys! We're in the final stretch. It won't be long before YOUR 'stangs are rolling off the end of the line!
There will be an increase in the number of Mustangs built each day up until Job 1. The total "Integrated Build" number is somewhere between 330-340 cars. So, in other words, from Today (Monday August 16th) until Sept. 7th, 330-340 mustangs will be built, with the daily build number increasing as the days go along.
For those of you interested in some info on the Plant itself, checkout the AAI website at:
AAI Website
Not ALOT of info, but there is some stuff for you diehards...
AAI Website
Not ALOT of info, but there is some stuff for you diehards...
Originally posted by AAI_T&F+August 15, 2004, 6:12 PM--></div><table border='0' align='center' width='95%' cellpadding='3' cellspacing='1'><tr><td>QUOTE (AAI_T&F @ August 15, 2004, 6:12 PM)</td></tr><tr><td id='QUOTE'> <!--QuoteBegin-V10@August 15, 2004, 3:27 PM
Thanks for the info. I assume that parts coming from suppliers will be a limiting factor in how fast you can ramp up production.
Thanks for the info. I assume that parts coming from suppliers will be a limiting factor in how fast you can ramp up production.
I believe the Integrated Build number is something like 330-340 until Job 1, somewhere in there, with the daily build count increasing every day.
This is it guys! We're in the final stretch. It won't be long before YOUR 'stangs are rolling off the end of the line! [/b][/quote]
here ya go:
STK/ORD# 5T821002 05 MUSTANG GT COUPE PRODUCTION
REF0TBF BODYSIZE I
EXT/INT CLR HP PERFORM WHITE/ KR DK CARC LEATHER/RED AC #CYL MPG
SERIAL# 1ZVHT82H855100382 LOCATION LIST PRICE
MFR STAT BUCKED SCHED DATE 06/07/2005 STAT DATE 08/06/2004
ORD
OPTIONAL EQUIPMENT
PKG 140A MUSTANG GT PREM COUPE
MUSTANG GT PREM COUPE
918 SHAKER 1000 AUDIO SYSTEM 14A ACTIVE ANTI THEFT
68R INTERIOR COLOR PKG 18G INTERIOR UPGRADE PACKAGE
13D REAR SPOLIER B04 PRE JOB 1
17L WHEEL LOCK KIT 43A FRONT SIDE AIRBAGS
64D 15 INCH STEEL WHEEL
Thread
Thread Starter
Forum
Replies
Last Post




