New Home Construction Begins
#1
Super Boss Lawman Member
Thread Starter
New Home Construction Begins
After months of looking for a lot, choosing a builder, getting financing approved, and getting permits, etc, our new home construction has begun. We'll have 2, two-car garages, the largest being 30x31 feet. The lot itself is 2 acres and the back porch will face west for beautiful Oklahoma sunsets by the pool.
#2
2013 RR Boss 302 #2342
Join Date: March 6, 2012
Location: Lancaster, PA
Posts: 11,668
Likes: 0
Received 2,174 Likes
on
1,621 Posts
Wow sounds great! Look forward to seeing it built!
#3
Legacy TMS Member
Awesome, congrats!
Keep posting updates, I love seeing house builds going on.
My wife and I bought a fixer-upper split-entry house in Dec '14, spent the next 7-8 months renovating it, had the kitchen, bathroom, and sunroom to bare studs before fully re-doing the whole house, new driveway, front lawn re-worked ..... yeah, tons of work and money.
So yeah, keep them updates coming!
.
Keep posting updates, I love seeing house builds going on.
My wife and I bought a fixer-upper split-entry house in Dec '14, spent the next 7-8 months renovating it, had the kitchen, bathroom, and sunroom to bare studs before fully re-doing the whole house, new driveway, front lawn re-worked ..... yeah, tons of work and money.
So yeah, keep them updates coming!
.
#4
Super Boss Lawman Member
Thread Starter
We are being told 7-9 months for completion. I'll take lots of pics, but unlike my last house, I won't be able to do it daily. The new house will be 25 miles south of work, and my current apartment in 30 miles north of the office.
#5
Super Boss Lawman Member
Thread Starter
Slab is ready to be poured. Plumbing is in the ground now. I noticed a sticker on one of the pipes indicating the city had inspected and approved of the work at this point.
#6
Super Boss Lawman Member
Thread Starter
It warmed up enough to pour the slab today. One thing I noticed this builder does different from others I have seen is that he has 3/8 or 1/2" bolts (threaded rod?) embedded in the concrete to bolt the frame down. Most I have seen use thin metal straps.
#9
Super Boss Lawman Member
Thread Starter
We finally have some framing done on the house. Due to rain and an ice storm, we only had about 4.5 days out of 10 to get any real work done. Next week is looking good so far.
#10
Mach 1 Member
Very nice. Looks like you have a large lot.
#12
2013 RR Boss 302 #2342
Join Date: March 6, 2012
Location: Lancaster, PA
Posts: 11,668
Likes: 0
Received 2,174 Likes
on
1,621 Posts
Looking good will it be a four car garage?
#17
Mach 1 Member
Join Date: October 17, 2004
Location: Phoenix, AZ.
Posts: 713
Likes: 0
Received 32 Likes
on
25 Posts
Beautiful house and I like all the land around it. Down here in the Phoenix area all the new houses are built practically on top of each other. If you go out in your back yard and fart the neighbors will hear you. Maybe that's why the neighbors don't talk to me??
Last edited by Scarpi; 3/24/18 at 02:57 PM.
#19
Like Father...
I ♥ Sausage
I ♥ Sausage
#20
Super Boss Lawman Member
Thread Starter
It's been a while since I posted here on the house. Things are moving along, and should pick up pace soon. Electrical rough-in complete, AC/Heat system in, plumbing is 98% (gas tie-in to the water heaters and two drains need their vent pipes run), and video/sound/network wiring done. Security system guy needs to do his thing, then the house can be inspected so that insulation, drywall, and masonry can begin. Masonry scheduled to start on Wednesday, May 30.